Quality Comes First! we make sure that every minute detail is looked into while we work.
Our focus is 100% on client needs and satisfaction.
Jiwanram engineering & infrastructure pvt ltd, has completed residual engineering design, utility (electricity, cooling water, compressed air, LPG, crane, infrastructure etc.) Items procurement, erection, testing, no load commissioning, load commissioning & PG test for 2 PFA production lines @ 100,000 TPA capacity per line with M/s. Continuus Properzi (OEM) at Vedanta, cast house, jharsuguda orissa.
Design, Engineering, Manufacturing, Supply, Erection, Testing, Commissioning and PG Test of all systems for the balance of plant.
Design, Engineering, Manufacturing, Supply, Erection, Testing, Commissioning and PG Test of all systems of Balance of Plant.
Propane, HSD, IPA Storage & Handling System,
Water System, Piping & Valves
Fire Fighting & Fire Detection system
Compressed Air System
HVAC System
DG Set
EOT Cranes & Hoists
Electricals (HT & LT)
Instrumentation, Automation & Communication system
Installation of all CCR Equipment viz Furnace, Rolling Mill, Cooling Systems, Coil Handling system with all required E&IC equipment as Free Issue materials (Approx weight 600 MT)
Application of Refractory work inside furnace
Jiwanram engineering & infrastructure Pvt Ltd, successfully installed and commissioned the work for design, engineering, manufacture, supply, erection & commissioning of alumina loading into silo#3 and unloading alumina at rate of 3000 TPH from silo and loading of alumina at the rate of 1500 TPH into railway wagons at alumina refinery plant for M/s. Utkal alumina international limited, Doraguda, dist. – Rayagada
Design, Engineering, Manufacturing, Supply, Erection, Testing, Commissioning Of The Supplied Plant Along With Associated Civil & Structural Works To Enhance The Capacity Of Zinc Smelter From 234 KTPA To 334 KTPA
Every one of our team members is devoted to delivering the finest possible industrial Solution.
Copyright 2023 | Jiwan. All Rights Reserved